Case studies · Oct 13, 2026
Florella: live in 2 days, trained with a 3-minute video
A new café with delivery in Sergeli has run on AliPos from day one, and Uzum Tezkor orders print by themselves

Before AliPos
The café opened at the same time as the system was set up. The manager had all the rush of the opening, no time for long training, and delivery orders from aggregators had to be accepted from the first days.
What was done in AliPos
The system was connected 2 days after purchase and rolled out step by step. The manager learned it on his own from a 3-minute video by the setup specialist — in a week. Uzum Tezkor is connected to AliPos: orders go straight to the printer. Yandex is being connected.
Results
| Metric | Value |
|---|---|
| Connected after purchase | 2 days |
| Manager training | 1 week, by video |
| Uzum Tezkor orders | straight to the printer |
Client’s words
«Good, great. It’s convenient for us that Uzum orders come straight out of the printer.»